Thermotec delivered a fully integrated floor build up system from the sub-floor base to the final floor screed using our TPA11 Aquafloor underfloor heating system and insulation using standard thermostats. The project was managed, installed and supervised by Thermotec, and was delivered on time and within budget.
In consultation with Briar Mechanical Services, Thermotec were asked to provide a complete design and installation scheme, in compliance with the latest environmental and technological heating systems. Octagon develop prestigious homes, Loom Lane being amongst them and had UFH installed in the basement, ground floor first floor and second floor.