Burlington Gate has redeveloped the existing 83,000 sq ft commercial building into 42 high quality design-led residential luxury apartments. Undergoing to the highest of international standards, Burlington Gate has brought a new perspective, centered around the first new arcade in Mayfair since 1930, with features of exceptional detailing and innovative styling, inspired by Mayfair's rich cultural heritage and contemporary scene.
In consultation with Essex Services Group PLC, Thermotec were asked to provide a complete design and installation scheme, in compliance with the latest environmental and technological heating systems. Thermotec delivered a fully integrated floor build up system using our TPA13 Moulded Board Pre-grooved system with a BMS control system throughout 42 apartments. The project was managed, installed and supervised by Thermotec, and was delivered on time and within budget.